tap into saving with Toronto Hydro

18 March 2014
Armand Gilks

PUMP UP YOUR SAVINGS Upgrade water systems and get payback as fast as four months. Powering the pumps in multi-residential buildings can add up to a significant cost. Add VFDs to pumps for electricity savings up to 50%. Plus, get incentives up to half of project costs.